The Hansen House Part 9: Insulation & Interior Systems
White PVC pipes run under the slab where the domestic hot and cold running water tubes are housed and run. These plumbing tubes are part of the Hansen House’s wet wall, a structural wall designed to...
View ArticleThe Hansen House Part 10: The Exterior
After the tar paper was installed on the exterior of the Hansen House, the next step was to install the venting network for the siding. Venting behind siding is necessary to prevent the major problems...
View ArticleHugh Lofting Gains PHIUS Certification
Congratulations to our sister company, Hugh Lofting Timber Framing, Inc: Hugh Lofting Timber Framing Gains Passive House Certification Company recognized by Passive House Institute US as one of only...
View ArticleThe Hansen House Part 11: The Kitchen
The workspace of the Hansen House’s kitchen is under the loft while the rest of the kitchen is open to above and out to the great room and dining area. The open ceiling allows the natural light to...
View ArticleThe Hansen House Part 12: The Great Room
If you were not familiar with the Hansen House, you would never guess what lies beyond the beautifully handcrafted reclaimed Oak front door. Custom arched door by Shawn Hollenshead Cabinetry. As you...
View ArticleThe Hansen House Part 13: The Loft
In continuation with the great room, I thought that it would be best to cover the loft area next. The loft consists of a sitting area and a balcony through which the chimney extends up through. The...
View ArticleKamp Kaolin
Scheduled for completion in November 2014, Kamp Kaolin is a high-performance 2,700-square-foot private home on a secluded site in Chester County, PA. HJLCMS collaborated with the homeowners and...
View ArticleKamp Kaolin Passive House Building Methods – Air Barrier
HJLCMS is proud to debut its first video on passive house building methods. The Kamp Kaolin Passive House Building Methods – Air Barrier video goes over the transition of window openings into the air...
View ArticleKamp Kaolin – Foundation & Air Barrier
In line with passive house building principles, the airtight building envelope begins at the foundation and is continued throughout the entire construction process and the entire house. The under-slab...
View ArticleKamp Kaolin Blower Door Test #1
Today was the initial blower door test at the Kamp Kaolin site. With all the passive house building methods used at Kamp Kaolin, we were very excited and confident going into the test. In the above...
View Article